US Bridges

I-69 over Watson & Summers Drain

Fair

Clinton County, Michigan · 0.2 MI West of Lowell RD · Structure no. 000000000001862

Built
1980
45 years old
Condition
Fair
inspected April 2024
Type
Culvert
Concrete
Length
25 ft
2 main spans
Daily traffic
28,930
2007 count
Owner
State
State Highway Agency

About this bridge

I-69 over Watson & Summers Drain is a concrete culvert carrying I-69 over Watson & Summers Drain in Clinton County, Michigan. It was built in 1980, so it is 45 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 28,930 vehicles a day, roughly 20% of them trucks, projected to reach 41,737 by 2018. The structure is 25 ft (7.6 m) long.

CarriesI-69
CrossesWatson & Summers Drain
Location0.2 MI West of Lowell RD
RouteInterstate 69
Coordinates42.79755, -84.64401
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionApril 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.1 US tons
Inventory rating107.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHS 20 + Mod
Structure length25 ft (7.6 m)
Longest span12 ft (3.7 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic28,930 (2007)
Projected traffic41,737 by 2018
Trucks20%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was I-69 over Watson & Summers Drain built?

It was built in 1980, making it 45 years old in 2025.

What condition is I-69 over Watson & Summers Drain in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.

How much traffic does I-69 over Watson & Summers Drain carry?

About 28,930 vehicles per day (2007 count), of which roughly 20% are trucks.

How long is I-69 over Watson & Summers Drain?

The structure is 25 ft (7.6 m) long with a longest span of 12 ft (3.7 m).

Who owns I-69 over Watson & Summers Drain?

It is owned by the State Highway Agency.