Sullivan Crk Trail over Black Creek
FairPosted for loadChippewa County, Michigan · 8 MI NW of Rudyard · Structure no. 000000000001663
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 54 ft
- 3 main spans
- Daily traffic
- 40
- 1986 count
- Owner
- County
- County Highway Agency
About this bridge
Sullivan Crk Trail over Black Creek is a steel continuous stringer/multi-beam or girder carrying Sullivan Crk Trail over Black Creek in Chippewa County, Michigan. It was built in 1950, so it is 75 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 40 vehicles a day, projected to reach 70 by 2019. The structure is 54 ft (16.4 m) long and 16 ft wide. If it were closed, the detour would be 37.9 mi (61 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Sullivan Crk Trail over Black Creek built?
It was built in 1950, making it 75 years old in 2025.
What condition is Sullivan Crk Trail over Black Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Sullivan Crk Trail over Black Creek carry?
About 40 vehicles per day (1986 count).
How long is Sullivan Crk Trail over Black Creek?
The structure is 54 ft (16.4 m) long with a longest span of 21 ft (6.4 m) and a deck 16 ft wide.
Who owns Sullivan Crk Trail over Black Creek?
It is owned by the County Highway Agency.