Tuori RD over South Br of Waiska River
FairPosted for loadChippewa County, Michigan · 2 MI E. of Dafter · Structure no. 000000000001623
- Built
- 1993
- 32 years old
- Condition
- Fair
- inspected June 2023
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 54 ft
- 1 main span
- Daily traffic
- 100
- Owner
- County
- County Highway Agency
About this bridge
Tuori RD over South Br of Waiska River is a prestressed concrete box beam or girders - multiple carrying Tuori RD over South Br of Waiska River in Chippewa County, Michigan. It was built in 1993, so it is 32 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 100 vehicles a day, projected to reach 195 by 2019. The structure is 54 ft (16.4 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Tuori RD over South Br of Waiska River built?
It was built in 1993, making it 32 years old in 2025.
What condition is Tuori RD over South Br of Waiska River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does Tuori RD over South Br of Waiska River carry?
About 100 vehicles per day (latest count).
How long is Tuori RD over South Br of Waiska River?
The structure is 54 ft (16.4 m) long with a longest span of 50 ft (15.2 m) and a deck 30 ft wide.
Who owns Tuori RD over South Br of Waiska River?
It is owned by the County Highway Agency.