M-129|PICKFORD RD over S Br Charlotte River
GoodChippewa County, Michigan · 0.2 MI N of 12 Mile Road · Structure no. 000000000001610
- Built
- 2010
- 15 years old
- Condition
- Good
- inspected May 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 77 ft
- 1 main span
- Daily traffic
- 3,500
- 2010 count
- Owner
- State
- State Highway Agency
About this bridge
M-129|PICKFORD RD over S Br Charlotte River is a prestressed concrete box beam or girders - single or spread carrying M-129|PICKFORD RD over S Br Charlotte River in Chippewa County, Michigan. It was built in 2010, so it is 15 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,500 vehicles a day, roughly 4% of them trucks, projected to reach 4,000 by 2030. The structure is 77 ft (23.6 m) long and 46 ft wide. If it were closed, the detour would be 14.3 mi (23 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-129|PICKFORD RD over S Br Charlotte River built?
It was built in 2010, making it 15 years old in 2025.
What condition is M-129|PICKFORD RD over S Br Charlotte River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2024.
How much traffic does M-129|PICKFORD RD over S Br Charlotte River carry?
About 3,500 vehicles per day (2010 count), of which roughly 4% are trucks.
How long is M-129|PICKFORD RD over S Br Charlotte River?
The structure is 77 ft (23.6 m) long with a longest span of 74 ft (22.6 m) and a deck 46 ft wide.
Who owns M-129|PICKFORD RD over S Br Charlotte River?
It is owned by the State Highway Agency.