Trowbridge Road over W Br Sturgeon River
PoorCheboygan County, Michigan · In Wolverine · Structure no. 000000000001560
- Built
- 1949
- 76 years old
- Condition
- Poor
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 31 ft
- 1 main span
- Daily traffic
- 520
- 2017 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Trowbridge Road over W Br Sturgeon River is a steel stringer/multi-beam or girder carrying Trowbridge Road over W Br Sturgeon River in Cheboygan County, Michigan. It was built in 1949, so it is 76 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 520 vehicles a day, projected to reach 650 by 2037. The structure is 31 ft (9.4 m) long and 28 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Trowbridge Road over W Br Sturgeon River built?
It was built in 1949, making it 76 years old in 2025.
What condition is Trowbridge Road over W Br Sturgeon River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2023.
How much traffic does Trowbridge Road over W Br Sturgeon River carry?
About 520 vehicles per day (2017 count).
How long is Trowbridge Road over W Br Sturgeon River?
The structure is 31 ft (9.4 m) long with a longest span of 29 ft (8.8 m) and a deck 28 ft wide.
Who owns Trowbridge Road over W Br Sturgeon River?
It is owned by the City or Municipal Highway Agency.