M-68|S Straits HWY over Sturgeon River
FairCheboygan County, Michigan · 0.8 MI W of I-75 · Structure no. 000000000001487
- Built
- 1927
- 98 years old, rebuilt 1992
- Condition
- Fair
- inspected June 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 61 ft
- 1 main span
- Daily traffic
- 10,873
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
M-68|S Straits HWY over Sturgeon River is a prestressed concrete stringer/multi-beam or girder carrying M-68|S Straits HWY over Sturgeon River in Cheboygan County, Michigan. It was built in 1927 and reconstructed in 1992, so it is 98 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 10,873 vehicles a day, roughly 2% of them trucks, projected to reach 11,025 by 2038. The structure is 61 ft (18.7 m) long and 47 ft wide. If it were closed, the detour would be 24.2 mi (39 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-68|S Straits HWY over Sturgeon River built?
It was built in 1927, making it 98 years old in 2025. It was reconstructed in 1992.
What condition is M-68|S Straits HWY over Sturgeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does M-68|S Straits HWY over Sturgeon River carry?
About 10,873 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is M-68|S Straits HWY over Sturgeon River?
The structure is 61 ft (18.7 m) long with a longest span of 58 ft (17.7 m) and a deck 47 ft wide.
Who owns M-68|S Straits HWY over Sturgeon River?
It is owned by the State Highway Agency.