Mount Zion Street over Christiana Creek
GoodCass County, Michigan · Calvin Twp Sec 19 · Structure no. 000000000013269
- Built
- 2017
- 8 years old
- Condition
- Good
- inspected October 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 60 ft
- 1 main span
- Daily traffic
- 232
- 2016 count
- Owner
- County
- County Highway Agency
About this bridge
Mount Zion Street over Christiana Creek is a prestressed concrete box beam or girders - multiple carrying Mount Zion Street over Christiana Creek in Cass County, Michigan. It was built in 2017, so it is 8 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 232 vehicles a day, projected to reach 256 by 2036. The structure is 60 ft (18.3 m) long and 31 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Mount Zion Street over Christiana Creek built?
It was built in 2017, making it 8 years old in 2025.
What condition is Mount Zion Street over Christiana Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in October 2024.
How much traffic does Mount Zion Street over Christiana Creek carry?
About 232 vehicles per day (2016 count).
How long is Mount Zion Street over Christiana Creek?
The structure is 60 ft (18.3 m) long with a longest span of 58 ft (17.6 m) and a deck 31 ft wide.
Who owns Mount Zion Street over Christiana Creek?
It is owned by the County Highway Agency.