S Hannah Street over East Branch of Kalamazoo
FairCalhoun County, Michigan · 9 Blocks East of M-99 · Structure no. 000000000001393
- Built
- 1981
- 44 years old
- Condition
- Fair
- inspected August 2024
- Type
- Box Beam or Girders - Multiple
- Prestressed Concrete
- Length
- 39 ft
- 1 main span
- Daily traffic
- 935
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
S Hannah Street over East Branch of Kalamazoo is a prestressed concrete box beam or girders - multiple carrying S Hannah Street over East Branch of Kalamazoo in Calhoun County, Michigan. It was built in 1981, so it is 44 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 935 vehicles a day, roughly 12% of them trucks, projected to reach 1,260 by 2042. The structure is 39 ft (11.8 m) long and 42 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Hannah Street over East Branch of Kalamazoo built?
It was built in 1981, making it 44 years old in 2025.
What condition is S Hannah Street over East Branch of Kalamazoo in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does S Hannah Street over East Branch of Kalamazoo carry?
About 935 vehicles per day (2022 count), of which roughly 12% are trucks.
How long is S Hannah Street over East Branch of Kalamazoo?
The structure is 39 ft (11.8 m) long with a longest span of 35 ft (10.6 m) and a deck 42 ft wide.
Who owns S Hannah Street over East Branch of Kalamazoo?
It is owned by the City or Municipal Highway Agency.