US Bridges

Baseline Road over Big Creek

Fair

Calhoun County, Michigan · 10 MI N of Marengo · Structure no. 000000000001367

Built
1984
41 years old
Condition
Fair
inspected September 2024
Type
Box Beam or Girders - Multiple
Prestressed Concrete
Length
22 ft
1 main span
Daily traffic
153
1994 count
Owner
County
County Highway Agency

About this bridge

Baseline Road over Big Creek is a prestressed concrete box beam or girders - multiple carrying Baseline Road over Big Creek in Calhoun County, Michigan. It was built in 1984, so it is 41 years old, younger than the Michigan average of 48.3 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 153 vehicles a day, roughly 5% of them trucks, projected to reach 285 by 2024. The structure is 22 ft (6.7 m) long and 30 ft wide. If it were closed, the detour would be 3.7 mi (6 km).

CarriesBaseline Road
CrossesBig Creek
Location10 MI N of Marengo
RouteCounty Highway 0
Coordinates42.42186, -84.85276
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourScour critical; foundations unstable for calculated scour conditions
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating107.6 US tons
Inventory rating64.5 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, precast panels
Main spans1
Design loadHS 20 + Mod
Structure length22 ft (6.7 m)
Longest span22 ft (6.7 m)
Deck width30 ft (9.2 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic153 (1994)
Projected traffic285 by 2024
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed3.7 mi (6 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Baseline Road over Big Creek built?

It was built in 1984, making it 41 years old in 2025.

What condition is Baseline Road over Big Creek in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does Baseline Road over Big Creek carry?

About 153 vehicles per day (1994 count), of which roughly 5% are trucks.

How long is Baseline Road over Big Creek?

The structure is 22 ft (6.7 m) long with a longest span of 22 ft (6.7 m) and a deck 30 ft wide.

Who owns Baseline Road over Big Creek?

It is owned by the County Highway Agency.