Riley Road over ST Joseph River
FairPosted for loadBranch County, Michigan · Sherwood Twp Sec 11 · Structure no. 000000000001176
- Built
- 1978
- 47 years old
- Condition
- Fair
- inspected October 2024
- Type
- Slab
- Wood or Timber
- Length
- 130 ft
- 5 main spans
- Daily traffic
- 322
- 2004 count
- Owner
- County
- County Highway Agency
About this bridge
Riley Road over ST Joseph River is a wood or timber slab carrying Riley Road over ST Joseph River in Branch County, Michigan. It was built in 1978, so it is 47 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 322 vehicles a day, roughly 4% of them trucks, projected to reach 444 by 2024. The structure is 130 ft (39.6 m) long and 32 ft wide. If it were closed, the detour would be 6.8 mi (11 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Riley Road over ST Joseph River built?
It was built in 1978, making it 47 years old in 2025.
What condition is Riley Road over ST Joseph River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Riley Road over ST Joseph River carry?
About 322 vehicles per day (2004 count), of which roughly 4% are trucks.
How long is Riley Road over ST Joseph River?
The structure is 130 ft (39.6 m) long with a longest span of 26 ft (7.9 m) and a deck 32 ft wide.
Who owns Riley Road over ST Joseph River?
It is owned by the County Highway Agency.