M-139 over Dowagiac River
FairBerrien County, Michigan · 0.76 MI S of M-140 · Structure no. 000000000000873
- Built
- 2012
- 13 years old
- Condition
- Fair
- inspected July 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 175 ft
- 2 main spans
- Daily traffic
- 8,000
- 2011 count
- Owner
- State
- State Highway Agency
About this bridge
M-139 over Dowagiac River is a prestressed concrete box beam or girders - single or spread carrying M-139 over Dowagiac River in Berrien County, Michigan. It was built in 2012, so it is 13 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,000 vehicles a day, roughly 3% of them trucks, projected to reach 9,300 by 2031. The structure is 175 ft (53.3 m) long and 47 ft wide. If it were closed, the detour would be 3.7 mi (6 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-139 over Dowagiac River built?
It was built in 2012, making it 13 years old in 2025.
What condition is M-139 over Dowagiac River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does M-139 over Dowagiac River carry?
About 8,000 vehicles per day (2011 count), of which roughly 3% are trucks.
How long is M-139 over Dowagiac River?
The structure is 175 ft (53.3 m) long with a longest span of 85 ft (25.8 m) and a deck 47 ft wide.
Who owns M-139 over Dowagiac River?
It is owned by the State Highway Agency.