Salzburg RD over M-47
PoorBay County, Michigan · 1.0 MI S of US-10 · Structure no. 000000000000651
- Built
- 1966
- 59 years old
- Condition
- Poor
- inspected February 2025
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 181 ft
- 4 main spans
- Daily traffic
- 2,670
- 1997 count
- Owner
- State
- State Highway Agency
About this bridge
Salzburg RD over M-47 is a prestressed concrete stringer/multi-beam or girder carrying Salzburg RD over M-47 in Bay County, Michigan. It was built in 1966, so it is 59 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 2,670 vehicles a day, roughly 3% of them trucks, projected to reach 9,999 by 1977. The structure is 181 ft (55.1 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Salzburg RD over M-47 built?
It was built in 1966, making it 59 years old in 2025.
What condition is Salzburg RD over M-47 in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in February 2025.
How much traffic does Salzburg RD over M-47 carry?
About 2,670 vehicles per day (1997 count), of which roughly 3% are trucks.
How long is Salzburg RD over M-47?
The structure is 181 ft (55.1 m) long with a longest span of 60 ft (18.2 m) and a deck 32 ft wide.
Who owns Salzburg RD over M-47?
It is owned by the State Highway Agency.