M-25 over Saginaw River & Jfk DR
FairBay County, Michigan · In Bay City · Structure no. 000000000000646
- Built
- 1958
- 67 years old, rebuilt 2005
- Condition
- Fair
- inspected April 2024
- Type
- Movable - Bascule
- Steel
- Length
- 854 ft
- 1 main span
- Daily traffic
- 23,441
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
M-25 over Saginaw River & Jfk DR is a steel movable - bascule carrying M-25 over Saginaw River & Jfk DR in Bay County, Michigan. It was built in 1958 and reconstructed in 2005, so it is 67 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,441 vehicles a day, roughly 3% of them trucks, projected to reach 35,333 by 2038. The structure is 854 ft (260.3 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was M-25 over Saginaw River & Jfk DR built?
It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2005.
What condition is M-25 over Saginaw River & Jfk DR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does M-25 over Saginaw River & Jfk DR carry?
About 23,441 vehicles per day (2021 count), of which roughly 3% are trucks.
How long is M-25 over Saginaw River & Jfk DR?
The structure is 854 ft (260.3 m) long with a longest span of 185 ft (56.4 m) and a deck 68 ft wide.
Who owns M-25 over Saginaw River & Jfk DR?
It is owned by the State Highway Agency.