Forest Road 2200 over Sturgeon River
FairBaraga County, Michigan · 4.5 MI NE of Sidnaw · Structure no. 090704000001003
- Built
- 1949
- 76 years old, rebuilt 1995
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 144 ft
- 3 main spans
- Daily traffic
- 50
- Owner
- Federal
- U.S. Forest Service
About this bridge
Forest Road 2200 over Sturgeon River is a steel continuous stringer/multi-beam or girder carrying Forest Road 2200 over Sturgeon River in Baraga County, Michigan. It was built in 1949 and reconstructed in 1995, so it is 76 years old, older than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 144 ft (43.9 m) long and 15 ft wide. If it were closed, the detour would be 22.4 mi (36 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Forest Road 2200 over Sturgeon River built?
It was built in 1949, making it 76 years old in 2025. It was reconstructed in 1995.
What condition is Forest Road 2200 over Sturgeon River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Forest Road 2200 over Sturgeon River carry?
About 50 vehicles per day (latest count).
How long is Forest Road 2200 over Sturgeon River?
The structure is 144 ft (43.9 m) long with a longest span of 56 ft (17.1 m) and a deck 15 ft wide.
Who owns Forest Road 2200 over Sturgeon River?
It is owned by the U.S. Forest Service.