10th Street over Rabbit River Drain
GoodAllegan County, Michigan · Leighton Twp Sec 31-32 · Structure no. 000000000000273
- Built
- 2009
- 16 years old
- Condition
- Good
- inspected April 2023
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 45 ft
- 1 main span
- Daily traffic
- 1,271
- 2007 count
- Owner
- County
- County Highway Agency
About this bridge
10th Street over Rabbit River Drain is a prestressed concrete box beam or girders - single or spread carrying 10th Street over Rabbit River Drain in Allegan County, Michigan. It was built in 2009, so it is 16 years old, younger than the Michigan average of 48.3 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,271 vehicles a day, roughly 5% of them trucks, projected to reach 2,091 by 2028. The structure is 45 ft (13.7 m) long and 43 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 10th Street over Rabbit River Drain built?
It was built in 2009, making it 16 years old in 2025.
What condition is 10th Street over Rabbit River Drain in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.
How much traffic does 10th Street over Rabbit River Drain carry?
About 1,271 vehicles per day (2007 count), of which roughly 5% are trucks.
How long is 10th Street over Rabbit River Drain?
The structure is 45 ft (13.7 m) long with a longest span of 41 ft (12.5 m) and a deck 43 ft wide.
Who owns 10th Street over Rabbit River Drain?
It is owned by the County Highway Agency.