Stagecoach RD over Piscataquis River
FairPiscataquis County, Maine · 1.9 MI S of Rtes 5 & 16 · Structure no. 2879
- Built
- 1931
- 94 years old
- Condition
- Fair
- inspected July 2023
- Type
- Tee Beam
- Concrete
- Length
- 218 ft
- 4 main spans
- Daily traffic
- 543
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Stagecoach RD over Piscataquis River is a concrete tee beam carrying Stagecoach RD over Piscataquis River in Piscataquis County, Maine. It was built in 1931, so it is 94 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 543 vehicles a day, roughly 5% of them trucks, projected to reach 869 by 2036. The structure is 218 ft (66.4 m) long and 25 ft wide. If it were closed, the detour would be 11.8 mi (19 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Stagecoach RD over Piscataquis River built?
It was built in 1931, making it 94 years old in 2025.
What condition is Stagecoach RD over Piscataquis River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Stagecoach RD over Piscataquis River carry?
About 543 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Stagecoach RD over Piscataquis River?
The structure is 218 ft (66.4 m) long with a longest span of 50 ft (15.2 m) and a deck 25 ft wide.
Who owns Stagecoach RD over Piscataquis River?
It is owned by the State Highway Agency.