Katahdin Iron Work over Middle Br Pleasant River
GoodPiscataquis County, Maine · 0.5 MI W JCT RTE 11 · Structure no. 0921
- Built
- 1998
- 27 years old
- Condition
- Good
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 88 ft
- 1 main span
- Daily traffic
- 123
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Katahdin Iron Work over Middle Br Pleasant River is a steel stringer/multi-beam or girder carrying Katahdin Iron Work over Middle Br Pleasant River in Piscataquis County, Maine. It was built in 1998, so it is 27 years old, younger than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 123 vehicles a day, roughly 5% of them trucks, projected to reach 197 by 2036. The structure is 88 ft (26.8 m) long and 27 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Katahdin Iron Work over Middle Br Pleasant River built?
It was built in 1998, making it 27 years old in 2025.
What condition is Katahdin Iron Work over Middle Br Pleasant River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does Katahdin Iron Work over Middle Br Pleasant River carry?
About 123 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Katahdin Iron Work over Middle Br Pleasant River?
The structure is 88 ft (26.8 m) long with a longest span of 85 ft (25.9 m) and a deck 27 ft wide.
Who owns Katahdin Iron Work over Middle Br Pleasant River?
It is owned by the State Highway Agency.