North ST over E.Branch Sebasticook R.
FairPosted for loadPenobscot County, Maine · 100 Ft E of JCT Water ST · Structure no. 2885
- Built
- 1951
- 74 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 72 ft
- 1 main span
- Daily traffic
- 1,335
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
North ST over E.Branch Sebasticook R. is a steel stringer/multi-beam or girder carrying North ST over E.Branch Sebasticook R. in Penobscot County, Maine. It was built in 1951, so it is 74 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 1,335 vehicles a day, roughly 5% of them trucks, projected to reach 2,003 by 2036. The structure is 72 ft (21.9 m) long and 31 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was North ST over E.Branch Sebasticook R. built?
It was built in 1951, making it 74 years old in 2025.
What condition is North ST over E.Branch Sebasticook R. in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does North ST over E.Branch Sebasticook R. carry?
About 1,335 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is North ST over E.Branch Sebasticook R.?
The structure is 72 ft (21.9 m) long with a longest span of 67 ft (20.4 m) and a deck 31 ft wide.
Who owns North ST over E.Branch Sebasticook R.?
It is owned by the State Highway Agency.