Medway RD over Salmon Stream
PoorPenobscot County, Maine · 2.7 Mi.E. I-95 · Structure no. 2738
- Built
- 1939
- 86 years old
- Condition
- Poor
- inspected October 2024
- Type
- Tee Beam
- Concrete
- Length
- 44 ft
- 1 main span
- Daily traffic
- 882
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Medway RD over Salmon Stream is a concrete tee beam carrying Medway RD over Salmon Stream in Penobscot County, Maine. It was built in 1939, so it is 86 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 882 vehicles a day, roughly 5% of them trucks, projected to reach 1,411 by 2036. The structure is 44 ft (13.4 m) long and 27 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Medway RD over Salmon Stream built?
It was built in 1939, making it 86 years old in 2025.
What condition is Medway RD over Salmon Stream in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in October 2024.
How much traffic does Medway RD over Salmon Stream carry?
About 882 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Medway RD over Salmon Stream?
The structure is 44 ft (13.4 m) long with a longest span of 41 ft (12.4 m) and a deck 27 ft wide.
Who owns Medway RD over Salmon Stream?
It is owned by the State Highway Agency.