Main ST over Cascade Stream
FairFranklin County, Maine · 0.1 MI S JCT S Shore Driv · Structure no. 2735
- Built
- 1955
- 70 years old, rebuilt 1987
- Condition
- Fair
- inspected December 2024
- Type
- Slab
- Concrete
- Length
- 29 ft
- 1 main span
- Daily traffic
- 1,580
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Main ST over Cascade Stream is a concrete slab carrying Main ST over Cascade Stream in Franklin County, Maine. It was built in 1955 and reconstructed in 1987, so it is 70 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,580 vehicles a day, roughly 5% of them trucks, projected to reach 2,370 by 2036. The structure is 29 ft (8.7 m) long and 41 ft wide. If it were closed, the detour would be 87 mi (140 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main ST over Cascade Stream built?
It was built in 1955, making it 70 years old in 2025. It was reconstructed in 1987.
What condition is Main ST over Cascade Stream in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2024.
How much traffic does Main ST over Cascade Stream carry?
About 1,580 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Main ST over Cascade Stream?
The structure is 29 ft (8.7 m) long with a longest span of 25 ft (7.6 m) and a deck 41 ft wide.
Who owns Main ST over Cascade Stream?
It is owned by the State Highway Agency.