Lambert Hill RD over Valley Brook Nely Chan
FairFranklin County, Maine · 0.2 MI W of JCT RTE 145 · Structure no. 1518
- Built
- 1988
- 37 years old
- Condition
- Fair
- inspected May 2024
- Type
- Slab
- Prestressed Concrete
- Length
- 83 ft
- 2 main spans
- Daily traffic
- 1,049
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Lambert Hill RD over Valley Brook Nely Chan is a prestressed concrete slab carrying Lambert Hill RD over Valley Brook Nely Chan in Franklin County, Maine. It was built in 1988, so it is 37 years old, younger than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,049 vehicles a day, roughly 5% of them trucks, projected to reach 1,574 by 2036. The structure is 83 ft (25.3 m) long and 32 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lambert Hill RD over Valley Brook Nely Chan built?
It was built in 1988, making it 37 years old in 2025.
What condition is Lambert Hill RD over Valley Brook Nely Chan in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Lambert Hill RD over Valley Brook Nely Chan carry?
About 1,049 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Lambert Hill RD over Valley Brook Nely Chan?
The structure is 83 ft (25.3 m) long with a longest span of 39 ft (11.9 m) and a deck 32 ft wide.
Who owns Lambert Hill RD over Valley Brook Nely Chan?
It is owned by the State Highway Agency.