US Bridges

I 295 NB over Franklin Street

Fair

Cumberland County, Maine · 2.2 MI N Townline · Structure no. 6300

Built
1974
51 years old, rebuilt 1995
Condition
Fair
inspected December 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
118 ft
1 main span
Daily traffic
30,150
2016 count
Owner
State
State Highway Agency

About this bridge

I 295 NB over Franklin Street is a steel stringer/multi-beam or girder carrying I 295 NB over Franklin Street in Cumberland County, Maine. It was built in 1974 and reconstructed in 1995, so it is 51 years old, younger than the Maine average of 53.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 30,150 vehicles a day, roughly 10% of them trucks, projected to reach 42,210 by 2036. The structure is 118 ft (36 m) long and 91 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 295 NB
CrossesFranklin Street
Location2.2 MI N Townline
RouteState Highway 295
StateMaine
Coordinates43.66581, -70.26094
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionDecember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating57.9 US tons
Inventory rating44.6 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length118 ft (36 m)
Longest span113 ft (34.5 m)
Deck width91 ft (27.6 m)
Roadway width83 ft (25.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic30,150 (2016)
Projected traffic42,210 by 2036
Trucks10%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 295 NB over Franklin Street built?

It was built in 1974, making it 51 years old in 2025. It was reconstructed in 1995.

What condition is I 295 NB over Franklin Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.

How much traffic does I 295 NB over Franklin Street carry?

About 30,150 vehicles per day (2016 count), of which roughly 10% are trucks.

How long is I 295 NB over Franklin Street?

The structure is 118 ft (36 m) long with a longest span of 113 ft (34.5 m) and a deck 91 ft wide.

Who owns I 295 NB over Franklin Street?

It is owned by the State Highway Agency.