I 295 NB over Presumpscot River
FairCumberland County, Maine · 1.0 MI N of Portland Tl · Structure no. 5828
- Built
- 1960
- 65 years old, rebuilt 1990
- Condition
- Fair
- inspected September 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 274 ft
- 3 main spans
- Daily traffic
- 27,010
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
I 295 NB over Presumpscot River is a steel continuous stringer/multi-beam or girder carrying I 295 NB over Presumpscot River in Cumberland County, Maine. It was built in 1960 and reconstructed in 1990, so it is 65 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 27,010 vehicles a day, roughly 10% of them trucks, projected to reach 37,814 by 2036. The structure is 274 ft (83.6 m) long and 35 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 295 NB over Presumpscot River built?
It was built in 1960, making it 65 years old in 2025. It was reconstructed in 1990.
What condition is I 295 NB over Presumpscot River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.
How much traffic does I 295 NB over Presumpscot River carry?
About 27,010 vehicles per day (2016 count), of which roughly 10% are trucks.
How long is I 295 NB over Presumpscot River?
The structure is 274 ft (83.6 m) long with a longest span of 110 ft (33.5 m) and a deck 35 ft wide.
Who owns I 295 NB over Presumpscot River?
It is owned by the State Highway Agency.