I-95 over Mcrr (nb)
FairCumberland County, Maine · 0.214 MI NW of Pinetree · Structure no. 0346
- Built
- 1956
- 69 years old, rebuilt 2019
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 242 ft
- 3 main spans
- Daily traffic
- 23,100
- 2016 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
I-95 over Mcrr (nb) is a steel continuous stringer/multi-beam or girder carrying I-95 over Mcrr (nb) in Cumberland County, Maine. It was built in 1956 and reconstructed in 2019, so it is 69 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 23,100 vehicles a day, roughly 10% of them trucks, projected to reach 32,340 by 2036. The structure is 242 ft (73.8 m) long and 57 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I-95 over Mcrr (nb) built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2019.
What condition is I-95 over Mcrr (nb) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does I-95 over Mcrr (nb) carry?
About 23,100 vehicles per day (2016 count), of which roughly 10% are trucks.
How long is I-95 over Mcrr (nb)?
The structure is 242 ft (73.8 m) long with a longest span of 94 ft (28.7 m) and a deck 57 ft wide.
Who owns I-95 over Mcrr (nb)?
It is owned by the State Toll Authority.