Cow Team RD over Interstate 95 NB & SB
FairAroostook County, Maine · 0.1 MI NW of Sherman Tl · Structure no. 6171
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 438 ft
- 6 main spans
- Daily traffic
- 50
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Cow Team RD over Interstate 95 NB & SB is a steel continuous stringer/multi-beam or girder carrying Cow Team RD over Interstate 95 NB & SB in Aroostook County, Maine. It was built in 1967, so it is 58 years old, older than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 50 vehicles a day, roughly 5% of them trucks, projected to reach 80 by 2036. The structure is 438 ft (133.4 m) long and 28 ft wide. If it were closed, the detour would be 100 mi (161 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Cow Team RD over Interstate 95 NB & SB built?
It was built in 1967, making it 58 years old in 2025.
What condition is Cow Team RD over Interstate 95 NB & SB in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does Cow Team RD over Interstate 95 NB & SB carry?
About 50 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Cow Team RD over Interstate 95 NB & SB?
The structure is 438 ft (133.4 m) long with a longest span of 85 ft (25.9 m) and a deck 28 ft wide.
Who owns Cow Team RD over Interstate 95 NB & SB?
It is owned by the State Highway Agency.