Route 219 over East Chan Androscoggin R
GoodAndroscoggin County, Maine · .2MI E 108 · Structure no. 3214
- Built
- 2008
- 17 years old
- Condition
- Good
- inspected December 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 142 ft
- 1 main span
- Daily traffic
- 3,461
- 2016 count
- Owner
- State
- State Highway Agency
About this bridge
Route 219 over East Chan Androscoggin R is a steel stringer/multi-beam or girder carrying Route 219 over East Chan Androscoggin R in Androscoggin County, Maine. It was built in 2008, so it is 17 years old, younger than the Maine average of 53.7 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 3,461 vehicles a day, roughly 5% of them trucks, projected to reach 4,845 by 2036. The structure is 142 ft (43.4 m) long and 36 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Route 219 over East Chan Androscoggin R built?
It was built in 2008, making it 17 years old in 2025.
What condition is Route 219 over East Chan Androscoggin R in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does Route 219 over East Chan Androscoggin R carry?
About 3,461 vehicles per day (2016 count), of which roughly 5% are trucks.
How long is Route 219 over East Chan Androscoggin R?
The structure is 142 ft (43.4 m) long with a longest span of 138 ft (42 m) and a deck 36 ft wide.
Who owns Route 219 over East Chan Androscoggin R?
It is owned by the State Highway Agency.