Is 95 NB over B & O RR
FairBaltimore city, Maryland · 0.25 MI S of Pulaski HWY · Structure no. 300000BCW598011
- Built
- 1972
- 53 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 403 ft
- 4 main spans
- Daily traffic
- 64,059
- 2019 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Is 95 NB over B & O RR is a steel continuous stringer/multi-beam or girder carrying Is 95 NB over B & O RR in Baltimore city, Maryland. It was built in 1972, so it is 53 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 64,059 vehicles a day, roughly 11% of them trucks, projected to reach 86,980 by 2041. The structure is 403 ft (122.8 m) long and 63 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Is 95 NB over B & O RR built?
It was built in 1972, making it 53 years old in 2025.
What condition is Is 95 NB over B & O RR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Is 95 NB over B & O RR carry?
About 64,059 vehicles per day (2019 count), of which roughly 11% are trucks.
How long is Is 95 NB over B & O RR?
The structure is 403 ft (122.8 m) long with a longest span of 142 ft (43.3 m) and a deck 63 ft wide.
Who owns Is 95 NB over B & O RR?
It is owned by the State Toll Authority.