Waterview Avenue over MD-295 B/W Parkway Ramp
PoorBaltimore city, Maryland · 0.6 MI S Is 95 · Structure no. 200000BC5403010
- Built
- 1950
- 75 years old
- Condition
- Poor
- inspected December 2024
- Type
- Tee Beam
- Concrete
- Length
- 75 ft
- 1 main span
- Daily traffic
- 6,246
- 2024 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Waterview Avenue over MD-295 B/W Parkway Ramp is a concrete tee beam carrying Waterview Avenue over MD-295 B/W Parkway Ramp in Baltimore city, Maryland. It was built in 1950, so it is 75 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 6,246 vehicles a day, roughly 5% of them trucks, projected to reach 9,282 by 2044. The structure is 75 ft (22.9 m) long and 70 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
No coordinates are recorded for this structure.
Condition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Waterview Avenue over MD-295 B/W Parkway Ramp built?
It was built in 1950, making it 75 years old in 2025.
What condition is Waterview Avenue over MD-295 B/W Parkway Ramp in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in December 2024.
How much traffic does Waterview Avenue over MD-295 B/W Parkway Ramp carry?
About 6,246 vehicles per day (2024 count), of which roughly 5% are trucks.
How long is Waterview Avenue over MD-295 B/W Parkway Ramp?
The structure is 75 ft (22.9 m) long with a longest span of 66 ft (20.1 m) and a deck 70 ft wide.
Who owns Waterview Avenue over MD-295 B/W Parkway Ramp?
It is owned by the City or Municipal Highway Agency.