Moravia Road Ramp over Herring Run
FairBaltimore city, Maryland · Moravia Ramp to Pulaski H · Structure no. 200000BC4214010
- Built
- 1970
- 55 years old, rebuilt 1993
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 206 ft
- 3 main spans
- Daily traffic
- 8,480
- 2015 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
Moravia Road Ramp over Herring Run is a steel continuous stringer/multi-beam or girder carrying Moravia Road Ramp over Herring Run in Baltimore city, Maryland. It was built in 1970 and reconstructed in 1993, so it is 55 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 8,480 vehicles a day, roughly 16% of them trucks, projected to reach 10,350 by 2035. The structure is 206 ft (62.8 m) long and 28 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Moravia Road Ramp over Herring Run built?
It was built in 1970, making it 55 years old in 2025. It was reconstructed in 1993.
What condition is Moravia Road Ramp over Herring Run in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Moravia Road Ramp over Herring Run carry?
About 8,480 vehicles per day (2015 count), of which roughly 16% are trucks.
How long is Moravia Road Ramp over Herring Run?
The structure is 206 ft (62.8 m) long with a longest span of 64 ft (19.5 m) and a deck 28 ft wide.
Who owns Moravia Road Ramp over Herring Run?
It is owned by the City or Municipal Highway Agency.