NB I83 to EB Npkwy over Jones Falls
FairBaltimore city, Maryland · NB I-83 Off Ramp · Structure no. 200000BC3119010
- Built
- 1959
- 66 years old, rebuilt 1987
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 323 ft
- 3 main spans
- Daily traffic
- 25,771
- 2022 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NB I83 to EB Npkwy over Jones Falls is a steel stringer/multi-beam or girder carrying NB I83 to EB Npkwy over Jones Falls in Baltimore city, Maryland. It was built in 1959 and reconstructed in 1987, so it is 66 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25,771 vehicles a day, roughly 8% of them trucks, projected to reach 32,052 by 2042. The structure is 323 ft (98.5 m) long and 27 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NB I83 to EB Npkwy over Jones Falls built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1987.
What condition is NB I83 to EB Npkwy over Jones Falls in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does NB I83 to EB Npkwy over Jones Falls carry?
About 25,771 vehicles per day (2022 count), of which roughly 8% are trucks.
How long is NB I83 to EB Npkwy over Jones Falls?
The structure is 323 ft (98.5 m) long with a longest span of 89 ft (27.1 m) and a deck 27 ft wide.
Who owns NB I83 to EB Npkwy over Jones Falls?
It is owned by the City or Municipal Highway Agency.