Halfway Boulevard over Underpass Way-Valley Mal
FairWashington County, Maryland · 0.32 MI E of I 81 · Structure no. 200000W-6661010
- Built
- 1971
- 54 years old
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 51 ft
- 1 main span
- Daily traffic
- 16,373
- 2008 count
- Owner
- County
- County Highway Agency
About this bridge
Halfway Boulevard over Underpass Way-Valley Mal is a steel stringer/multi-beam or girder carrying Halfway Boulevard over Underpass Way-Valley Mal in Washington County, Maryland. It was built in 1971, so it is 54 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,373 vehicles a day, roughly 5% of them trucks, projected to reach 28,187 by 2030. The structure is 51 ft (15.5 m) long and 90 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Halfway Boulevard over Underpass Way-Valley Mal built?
It was built in 1971, making it 54 years old in 2025.
What condition is Halfway Boulevard over Underpass Way-Valley Mal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Halfway Boulevard over Underpass Way-Valley Mal carry?
About 16,373 vehicles per day (2008 count), of which roughly 5% are trucks.
How long is Halfway Boulevard over Underpass Way-Valley Mal?
The structure is 51 ft (15.5 m) long with a longest span of 48 ft (14.6 m) and a deck 90 ft wide.
Who owns Halfway Boulevard over Underpass Way-Valley Mal?
It is owned by the County Highway Agency.