Maryland RT.458-SI over Suitland Parkway
FairPrince George's County, Maryland · 1.8 Miles from Suitland R · Structure no. 3564005P0000000
- Built
- 1943
- 82 years old, rebuilt 1965
- Condition
- Fair
- inspected February 2024
- Type
- Frame
- Concrete Continuous
- Length
- 101 ft
- 2 main spans
- Daily traffic
- 42,725
- 2019 count
- Owner
- Federal
- National Park Service
About this bridge
Maryland RT.458-SI over Suitland Parkway is a concrete continuous frame carrying Maryland RT.458-SI over Suitland Parkway in Prince George's County, Maryland. It was built in 1943 and reconstructed in 1965, so it is 82 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 42,725 vehicles a day, roughly 1% of them trucks, projected to reach 46,000 by 2039. The structure is 101 ft (30.9 m) long and 100 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Maryland RT.458-SI over Suitland Parkway built?
It was built in 1943, making it 82 years old in 2025. It was reconstructed in 1965.
What condition is Maryland RT.458-SI over Suitland Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Maryland RT.458-SI over Suitland Parkway carry?
About 42,725 vehicles per day (2019 count), of which roughly 1% are trucks.
How long is Maryland RT.458-SI over Suitland Parkway?
The structure is 101 ft (30.9 m) long with a longest span of 44 ft (13.4 m) and a deck 100 ft wide.
Who owns Maryland RT.458-SI over Suitland Parkway?
It is owned by the National Park Service.