Montevideo Road over Dry Seneca Creek
GoodPosted for loadMontgomery County, Maryland · 1.1 Miles North of Md 190 · Structure no. 200000M-0030010
- Built
- 1910
- 115 years old, rebuilt 2018
- Condition
- Good
- inspected March 2023
- Type
- Truss - Thru
- Steel
- Length
- 53 ft
- 1 main span
- Daily traffic
- 150
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Montevideo Road over Dry Seneca Creek is a steel truss - thru carrying Montevideo Road over Dry Seneca Creek in Montgomery County, Maryland. It was built in 1910 and reconstructed in 2018, so it is 115 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. Its operating status is: posted for load restriction.
It carries about 150 vehicles a day, roughly 5% of them trucks, projected to reach 200 by 2041. The structure is 53 ft (16.1 m) long and 14 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Montevideo Road over Dry Seneca Creek built?
It was built in 1910, making it 115 years old in 2025. It was reconstructed in 2018.
What condition is Montevideo Road over Dry Seneca Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in March 2023.
How much traffic does Montevideo Road over Dry Seneca Creek carry?
About 150 vehicles per day (2019 count), of which roughly 5% are trucks.
How long is Montevideo Road over Dry Seneca Creek?
The structure is 53 ft (16.1 m) long with a longest span of 49 ft (14.9 m) and a deck 14 ft wide.
Who owns Montevideo Road over Dry Seneca Creek?
It is owned by the County Highway Agency.