South Palmer Road over Parking Garage
FairPosted for loadMontgomery County, Maryland · 1 KM W of Rt. 185 · Structure no. 1MD0071
- Built
- 1980
- 45 years old, rebuilt 2014
- Condition
- Fair
- inspected June 2023
- Type
- Slab
- Concrete
- Length
- 665 ft
- 22 main spans
- Daily traffic
- 200
- 2015 count
- Owner
- Federal
- Navy / Marines
About this bridge
South Palmer Road over Parking Garage is a concrete slab carrying South Palmer Road over Parking Garage in Montgomery County, Maryland. It was built in 1980 and reconstructed in 2014, so it is 45 years old, younger than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 200 vehicles a day, roughly 5% of them trucks, projected to reach 250 by 2040. The structure is 665 ft (202.8 m) long and 30 ft wide. If it were closed, the detour would be 0.6 mi (1 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was South Palmer Road over Parking Garage built?
It was built in 1980, making it 45 years old in 2025. It was reconstructed in 2014.
What condition is South Palmer Road over Parking Garage in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does South Palmer Road over Parking Garage carry?
About 200 vehicles per day (2015 count), of which roughly 5% are trucks.
How long is South Palmer Road over Parking Garage?
The structure is 665 ft (202.8 m) long with a longest span of 31 ft (9.4 m) and a deck 30 ft wide.
Who owns South Palmer Road over Parking Garage?
It is owned by the Navy / Marines.