US Bridges

South Tollgate Roa over Plumtree Run

Good

Harford County, Maryland · 0.38 Mi. N. Plumtree Rd. · Structure no. 200000H-0233010

Built
2019
6 years old
Condition
Good
inspected September 2023
Type
Arch - Deck
Concrete
Length
36 ft
1 main span
Daily traffic
225
2023 count
Owner
County
County Highway Agency

About this bridge

South Tollgate Roa over Plumtree Run is a concrete arch - deck carrying South Tollgate Roa over Plumtree Run in Harford County, Maryland. It was built in 2019, so it is 6 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 225 vehicles a day, roughly 5% of them trucks, projected to reach 275 by 2043. The structure is 36 ft (11 m) long and 50 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

Location

No coordinates are recorded for this structure.

CarriesSouth Tollgate Roa
CrossesPlumtree Run
Location0.38 Mi. N. Plumtree Rd.
RouteCounty Highway 0
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating76.9 US tons
Inventory rating54 US tons

Structure

Structure typeArch - Deck
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 25 or greater
Structure length36 ft (11 m)
Longest span36 ft (11 m)
Deck width50 ft (15.2 m)
Roadway width35 ft (10.7 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic225 (2023)
Projected traffic275 by 2043
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was South Tollgate Roa over Plumtree Run built?

It was built in 2019, making it 6 years old in 2025.

What condition is South Tollgate Roa over Plumtree Run in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2023.

How much traffic does South Tollgate Roa over Plumtree Run carry?

About 225 vehicles per day (2023 count), of which roughly 5% are trucks.

How long is South Tollgate Roa over Plumtree Run?

The structure is 36 ft (11 m) long with a longest span of 36 ft (11 m) and a deck 50 ft wide.

Who owns South Tollgate Roa over Plumtree Run?

It is owned by the County Highway Agency.