Md 22 over AMTRAK Trib to Swan CR
FairHarford County, Maryland · 0.06 Mile East of US 40 · Structure no. 100000120005010
- Built
- 1968
- 57 years old, rebuilt 1971
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 117 ft
- 2 main spans
- Daily traffic
- 22,420
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
Md 22 over AMTRAK Trib to Swan CR is a steel stringer/multi-beam or girder carrying Md 22 over AMTRAK Trib to Swan CR in Harford County, Maryland. It was built in 1968 and reconstructed in 1971, so it is 57 years old, older than the Maryland average of 52.6 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 22,420 vehicles a day, roughly 8% of them trucks, projected to reach 33,315 by 2038. The structure is 117 ft (35.7 m) long and 94 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Md 22 over AMTRAK Trib to Swan CR built?
It was built in 1968, making it 57 years old in 2025. It was reconstructed in 1971.
What condition is Md 22 over AMTRAK Trib to Swan CR in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Md 22 over AMTRAK Trib to Swan CR carry?
About 22,420 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is Md 22 over AMTRAK Trib to Swan CR?
The structure is 117 ft (35.7 m) long with a longest span of 90 ft (27.4 m) and a deck 94 ft wide.
Who owns Md 22 over AMTRAK Trib to Swan CR?
It is owned by the State Highway Agency.