US Bridges

Winchester Bouleva over Tributary of Tuscarora C

Good

Frederick County, Maryland · West of Harvard Place · Structure no. 200000F-0130030

Built
2002
23 years old
Condition
Good
inspected May 2023
Type
Culvert
Steel
Length
28 ft
1 main span
Daily traffic
350
2009 count
Owner
County
County Highway Agency

About this bridge

Winchester Bouleva over Tributary of Tuscarora C is a steel culvert carrying Winchester Bouleva over Tributary of Tuscarora C in Frederick County, Maryland. It was built in 2002, so it is 23 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 350 vehicles a day, roughly 5% of them trucks, projected to reach 420 by 2032. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesWinchester Bouleva
CrossesTributary of Tuscarora C
LocationWest of Harvard Place
RouteCounty Highway 1977
Coordinates39.34799, -77.49895
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection7 GoodSome minor problems.
Culvert7 GoodSome minor problems.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating30 US tons

Structure

Structure typeCulvert
MaterialSteel
DeckNot applicable
Main spans1
Design loadHS 20
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic350 (2009)
Projected traffic420 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Winchester Bouleva over Tributary of Tuscarora C built?

It was built in 2002, making it 23 years old in 2025.

What condition is Winchester Bouleva over Tributary of Tuscarora C in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Winchester Bouleva over Tributary of Tuscarora C carry?

About 350 vehicles per day (2009 count), of which roughly 5% are trucks.

How long is Winchester Bouleva over Tributary of Tuscarora C?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m).

Who owns Winchester Bouleva over Tributary of Tuscarora C?

It is owned by the County Highway Agency.