US Bridges

Is 195 Ebr over Is 895

Fair

Baltimore County, Maryland · 0.38 MI N of Aa CO Line · Structure no. 100000030341013

Built
1987
38 years old
Condition
Fair
inspected October 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
281 ft
2 main spans
Daily traffic
39,015
2009 count
Owner
State
State Highway Agency

About this bridge

Is 195 Ebr over Is 895 is a steel continuous stringer/multi-beam or girder carrying Is 195 Ebr over Is 895 in Baltimore County, Maryland. It was built in 1987, so it is 38 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 39,015 vehicles a day, roughly 8% of them trucks, projected to reach 21,011 by 2026. The structure is 281 ft (85.6 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

Location

No coordinates are recorded for this structure.

CarriesIs 195 Ebr
CrossesIs 895
Location0.38 MI N of Aa CO Line
RouteInterstate 195
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionOctober 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating87 US tons
Inventory rating51 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20 + Mod
Structure length281 ft (85.6 m)
Longest span145 ft (44.2 m)
Deck width56 ft (17.1 m)
Roadway width52 ft (15.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic39,015 (2009)
Projected traffic21,011 by 2026
Trucks8%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Is 195 Ebr over Is 895 built?

It was built in 1987, making it 38 years old in 2025.

What condition is Is 195 Ebr over Is 895 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.

How much traffic does Is 195 Ebr over Is 895 carry?

About 39,015 vehicles per day (2009 count), of which roughly 8% are trucks.

How long is Is 195 Ebr over Is 895?

The structure is 281 ft (85.6 m) long with a longest span of 145 ft (44.2 m) and a deck 56 ft wide.

Who owns Is 195 Ebr over Is 895?

It is owned by the State Highway Agency.