US Bridges

Md 295 Sbr over Md 100

Good

Anne Arundel County, Maryland · 2.7 MI SE of Is 95 · Structure no. 100000020180012

Built
1992
33 years old
Condition
Good
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
208 ft
2 main spans
Daily traffic
88,882
9 count
Owner
State
State Highway Agency

About this bridge

Md 295 Sbr over Md 100 is a steel continuous stringer/multi-beam or girder carrying Md 295 Sbr over Md 100 in Anne Arundel County, Maryland. It was built in 1992, so it is 33 years old, younger than the Maryland average of 52.6 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 88,882 vehicles a day, roughly 8% of them trucks, projected to reach 49,228 by 26. The structure is 208 ft (63.4 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMd 295 Sbr
CrossesMd 100
Location2.7 MI SE of Is 95
RouteState Highway 295
Coordinates39.17075, -76.73085
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating81.5 US tons
Inventory rating48.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHS 20
Structure length208 ft (63.4 m)
Longest span103 ft (31.4 m)
Deck width52 ft (15.9 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic88,882 (9)
Projected traffic49,228 by 26
Trucks8%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Md 295 Sbr over Md 100 built?

It was built in 1992, making it 33 years old in 2025.

What condition is Md 295 Sbr over Md 100 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.

How much traffic does Md 295 Sbr over Md 100 carry?

About 88,882 vehicles per day (9 count), of which roughly 8% are trucks.

How long is Md 295 Sbr over Md 100?

The structure is 208 ft (63.4 m) long with a longest span of 103 ft (31.4 m) and a deck 52 ft wide.

Who owns Md 295 Sbr over Md 100?

It is owned by the State Highway Agency.