ST122 A/Vernon ST over I 290
FairWorcester County, Massachusetts · .1 MI E of Kelly Sq · Structure no. W440851N9DOTNBI
- Built
- 1959
- 66 years old, rebuilt 1989
- Condition
- Fair
- inspected May 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 143 ft
- 2 main spans
- Daily traffic
- 21,000
- 2024 count
- Owner
- State
- State Highway Agency
About this bridge
ST122 A/Vernon ST over I 290 is a steel stringer/multi-beam or girder carrying ST122 A/Vernon ST over I 290 in Worcester County, Massachusetts. It was built in 1959 and reconstructed in 1989, so it is 66 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 21,000 vehicles a day, roughly 10% of them trucks, projected to reach 23,058 by 2031. The structure is 143 ft (43.6 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST122 A/Vernon ST over I 290 built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1989.
What condition is ST122 A/Vernon ST over I 290 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in May 2024.
How much traffic does ST122 A/Vernon ST over I 290 carry?
About 21,000 vehicles per day (2024 count), of which roughly 10% are trucks.
How long is ST122 A/Vernon ST over I 290?
The structure is 143 ft (43.6 m) long with a longest span of 65 ft (19.8 m) and a deck 52 ft wide.
Who owns ST122 A/Vernon ST over I 290?
It is owned by the State Highway Agency.