ST 12 Spring ST over Water Millers River
GoodWorcester County, Massachusetts · .5 MI S JCT ST 140 · Structure no. W39021AU1DOTNBI
- Built
- 2001
- 24 years old
- Condition
- Good
- inspected February 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 43 ft
- 1 main span
- Daily traffic
- 9,107
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
ST 12 Spring ST over Water Millers River is a prestressed concrete box beam or girders - single or spread carrying ST 12 Spring ST over Water Millers River in Worcester County, Massachusetts. It was built in 2001, so it is 24 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 9,107 vehicles a day, roughly 2% of them trucks, projected to reach 5,310 by 2033. The structure is 43 ft (13.2 m) long and 38 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 12 Spring ST over Water Millers River built?
It was built in 2001, making it 24 years old in 2025.
What condition is ST 12 Spring ST over Water Millers River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in February 2024.
How much traffic does ST 12 Spring ST over Water Millers River carry?
About 9,107 vehicles per day (2018 count), of which roughly 2% are trucks.
How long is ST 12 Spring ST over Water Millers River?
The structure is 43 ft (13.2 m) long with a longest span of 40 ft (12.2 m) and a deck 38 ft wide.
Who owns ST 12 Spring ST over Water Millers River?
It is owned by the State Highway Agency.