HWY New Bstn RD over I 90
FairWorcester County, Massachusetts · At I-90 Mm 77.2 · Structure no. S300284MWDOTNBI
- Built
- 1957
- 68 years old, rebuilt 1996
- Condition
- Fair
- inspected October 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 159 ft
- 2 main spans
- Daily traffic
- 3,265
- 2022 count
- Owner
- State
- State Highway Agency
About this bridge
HWY New Bstn RD over I 90 is a steel continuous stringer/multi-beam or girder carrying HWY New Bstn RD over I 90 in Worcester County, Massachusetts. It was built in 1957 and reconstructed in 1996, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 3,265 vehicles a day, roughly 6% of them trucks, projected to reach 1,106 by 2032. The structure is 159 ft (48.5 m) long and 32 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was HWY New Bstn RD over I 90 built?
It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1996.
What condition is HWY New Bstn RD over I 90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2023.
How much traffic does HWY New Bstn RD over I 90 carry?
About 3,265 vehicles per day (2022 count), of which roughly 6% are trucks.
How long is HWY New Bstn RD over I 90?
The structure is 159 ft (48.5 m) long with a longest span of 77 ft (23.5 m) and a deck 32 ft wide.
Who owns HWY New Bstn RD over I 90?
It is owned by the State Highway Agency.