ST146 NB over HWY Main ST
FairWorcester County, Massachusetts · 100 Ft N. of Sutton Tl · Structure no. N210141MJDOTNBI
- Built
- 1950
- 75 years old, rebuilt 2006
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 118 ft
- 3 main spans
- Daily traffic
- 18,954
- 2021 count
- Owner
- State
- State Highway Agency
About this bridge
ST146 NB over HWY Main ST is a steel continuous stringer/multi-beam or girder carrying ST146 NB over HWY Main ST in Worcester County, Massachusetts. It was built in 1950 and reconstructed in 2006, so it is 75 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 18,954 vehicles a day, roughly 7% of them trucks, projected to reach 19,267 by 2032. The structure is 118 ft (36 m) long and 47 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST146 NB over HWY Main ST built?
It was built in 1950, making it 75 years old in 2025. It was reconstructed in 2006.
What condition is ST146 NB over HWY Main ST in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does ST146 NB over HWY Main ST carry?
About 18,954 vehicles per day (2021 count), of which roughly 7% are trucks.
How long is ST146 NB over HWY Main ST?
The structure is 118 ft (36 m) long with a longest span of 54 ft (16.5 m) and a deck 47 ft wide.
Who owns ST146 NB over HWY Main ST?
It is owned by the State Highway Agency.