US Bridges

I 290 EB over HWY Church ST

Fair

Worcester County, Massachusetts · I-290 Eb/ Church ST · Structure no. N200211R5DOTNBI

Built
1968
57 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
155 ft
3 main spans
Daily traffic
38,490
2023 count
Owner
State
State Highway Agency

About this bridge

I 290 EB over HWY Church ST is a steel stringer/multi-beam or girder carrying I 290 EB over HWY Church ST in Worcester County, Massachusetts. It was built in 1968, so it is 57 years old, younger than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 38,490 vehicles a day, roughly 6% of them trucks, projected to reach 61,593 by 2031. The structure is 155 ft (47.2 m) long and 56 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI 290 EB
CrossesHWY Church ST
LocationI-290 Eb/ Church ST
RouteInterstate 290
Coordinates42.33237, -71.67975
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating63.5 US tons
Inventory rating38 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length155 ft (47.2 m)
Longest span81 ft (24.7 m)
Deck width56 ft (17.1 m)
Roadway width52 ft (15.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic38,490 (2023)
Projected traffic61,593 by 2031
Trucks6%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$2.9 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 290 EB over HWY Church ST built?

It was built in 1968, making it 57 years old in 2025.

What condition is I 290 EB over HWY Church ST in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I 290 EB over HWY Church ST carry?

About 38,490 vehicles per day (2023 count), of which roughly 6% are trucks.

How long is I 290 EB over HWY Church ST?

The structure is 155 ft (47.2 m) long with a longest span of 81 ft (24.7 m) and a deck 56 ft wide.

Who owns I 290 EB over HWY Church ST?

It is owned by the State Highway Agency.