ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff
FairWorcester County, Massachusetts · 1000 Ft E of Shrewsbry Tl · Structure no. N200161LYDOTNBI
- Built
- 1930
- 95 years old, rebuilt 1988
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 66 ft
- 1 main span
- Daily traffic
- 46,980
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff is a steel stringer/multi-beam or girder carrying ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff in Worcester County, Massachusetts. It was built in 1930 and reconstructed in 1988, so it is 95 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 46,980 vehicles a day, roughly 7% of them trucks, projected to reach 61,593 by 2032. The structure is 66 ft (20.1 m) long and 75 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff built?
It was built in 1930, making it 95 years old in 2025. It was reconstructed in 1988.
What condition is ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff carry?
About 46,980 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff?
The structure is 66 ft (20.1 m) long with a longest span of 58 ft (17.8 m) and a deck 75 ft wide.
Who owns ST 9 Bstn-Wrcstr over US 20 Southwest Cutoff?
It is owned by the State Highway Agency.