US Bridges

HWY Brigham Hill over I 90

Fair

Worcester County, Massachusetts · I-90 Mm 97.2 · Structure no. G080294LJDOTNBI

Built
1957
68 years old, rebuilt 1994
Condition
Fair
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
191 ft
2 main spans
Daily traffic
1,200
2022 count
Owner
State
State Highway Agency

About this bridge

HWY Brigham Hill over I 90 is a steel continuous stringer/multi-beam or girder carrying HWY Brigham Hill over I 90 in Worcester County, Massachusetts. It was built in 1957 and reconstructed in 1994, so it is 68 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 1,200 vehicles a day, roughly 5% of them trucks, projected to reach 2,211 by 2032. The structure is 191 ft (58.3 m) long and 35 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesHWY Brigham Hill
CrossesI 90
LocationI-90 Mm 97.2
RouteCity Street 0
Coordinates42.22309, -71.72261
Functional classUrban Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry4: Meets minimum tolerable limits to be left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating51.8 US tons
Inventory rating31 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2 (+2 approach)
Design loadHS 20
Structure length191 ft (58.3 m)
Longest span66 ft (20.1 m)
Deck width35 ft (10.7 m)
Roadway width24 ft (7.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic1,200 (2022)
Projected traffic2,211 by 2032
Trucks5%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$6.1 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was HWY Brigham Hill over I 90 built?

It was built in 1957, making it 68 years old in 2025. It was reconstructed in 1994.

What condition is HWY Brigham Hill over I 90 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.

How much traffic does HWY Brigham Hill over I 90 carry?

About 1,200 vehicles per day (2022 count), of which roughly 5% are trucks.

How long is HWY Brigham Hill over I 90?

The structure is 191 ft (58.3 m) long with a longest span of 66 ft (20.1 m) and a deck 35 ft wide.

Who owns HWY Brigham Hill over I 90?

It is owned by the State Highway Agency.