ST122 A/Main ST over Water Blackstone River
FairWorcester County, Massachusetts · At Corner of Cross Street · Structure no. G080091YWDOTNBI
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 87 ft
- 1 main span
- Daily traffic
- 4,452
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST122 A/Main ST over Water Blackstone River is a steel stringer/multi-beam or girder carrying ST122 A/Main ST over Water Blackstone River in Worcester County, Massachusetts. It was built in 1957, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,452 vehicles a day, roughly 7% of them trucks, projected to reach 6,791 by 2031. The structure is 87 ft (26.5 m) long and 58 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST122 A/Main ST over Water Blackstone River built?
It was built in 1957, making it 68 years old in 2025.
What condition is ST122 A/Main ST over Water Blackstone River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does ST122 A/Main ST over Water Blackstone River carry?
About 4,452 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is ST122 A/Main ST over Water Blackstone River?
The structure is 87 ft (26.5 m) long with a longest span of 84 ft (25.6 m) and a deck 58 ft wide.
Who owns ST122 A/Main ST over Water Blackstone River?
It is owned by the State Highway Agency.