US Bridges

ST 2 WB over HWY Pearson Blvd NB

Fair

Worcester County, Massachusetts · .5 Mi. E. of ST-68 · Structure no. G010311NADOTNBI

Built
1961
64 years old
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
139 ft
3 main spans
Daily traffic
11,527
2023 count
Owner
State
State Highway Agency

About this bridge

ST 2 WB over HWY Pearson Blvd NB is a steel stringer/multi-beam or girder carrying ST 2 WB over HWY Pearson Blvd NB in Worcester County, Massachusetts. It was built in 1961, so it is 64 years old, older than the Massachusetts average of 63.8 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 11,527 vehicles a day, roughly 15% of them trucks, projected to reach 47,379 by 2031. The structure is 139 ft (42.4 m) long and 44 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesST 2 WB
CrossesHWY Pearson Blvd NB
Location.5 Mi. E. of ST-68
RouteState Highway 2
Coordinates42.56408, -71.97843
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating45.4 US tons
Inventory rating27.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans3
Design loadH 20
Structure length139 ft (42.4 m)
Longest span60 ft (18.3 m)
Deck width44 ft (13.4 m)
Roadway width38 ft (11.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic11,527 (2023)
Projected traffic47,379 by 2031
Trucks15%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusPossibly eligible for the National Register; requires further investigation
Work proposedRehabilitation because of general structure deterioration or inadequate strength
Estimated improvement cost$5.6 million (2025 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was ST 2 WB over HWY Pearson Blvd NB built?

It was built in 1961, making it 64 years old in 2025.

What condition is ST 2 WB over HWY Pearson Blvd NB in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does ST 2 WB over HWY Pearson Blvd NB carry?

About 11,527 vehicles per day (2023 count), of which roughly 15% are trucks.

How long is ST 2 WB over HWY Pearson Blvd NB?

The structure is 139 ft (42.4 m) long with a longest span of 60 ft (18.3 m) and a deck 44 ft wide.

Who owns ST 2 WB over HWY Pearson Blvd NB?

It is owned by the State Highway Agency.