ST 2 A/ST12/KIMBL over Water N Nashua River
GoodWorcester County, Massachusetts · 200 Ft. East of Rotary · Structure no. F04007B90DOTNBI
- Built
- 2014
- 11 years old
- Condition
- Good
- inspected December 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 109 ft
- 1 main span
- Daily traffic
- 5,992
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
ST 2 A/ST12/KIMBL over Water N Nashua River is a prestressed concrete box beam or girders - single or spread carrying ST 2 A/ST12/KIMBL over Water N Nashua River in Worcester County, Massachusetts. It was built in 2014, so it is 11 years old, younger than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 5,992 vehicles a day, roughly 7% of them trucks. The structure is 109 ft (33.1 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was ST 2 A/ST12/KIMBL over Water N Nashua River built?
It was built in 2014, making it 11 years old in 2025.
What condition is ST 2 A/ST12/KIMBL over Water N Nashua River in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in December 2024.
How much traffic does ST 2 A/ST12/KIMBL over Water N Nashua River carry?
About 5,992 vehicles per day (2023 count), of which roughly 7% are trucks.
How long is ST 2 A/ST12/KIMBL over Water N Nashua River?
The structure is 109 ft (33.1 m) long with a longest span of 105 ft (32 m) and a deck 49 ft wide.
Who owns ST 2 A/ST12/KIMBL over Water N Nashua River?
It is owned by the State Highway Agency.