Access Road over Spillway Channel
FairPosted for loadWorcester County, Massachusetts · 12.9 KM S of Gardner · Structure no. CEPNEDMA2510011
- Built
- 1957
- 68 years old
- Condition
- Fair
- inspected September 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 97 ft
- 1 main span
- Daily traffic
- 75
- 2024 count
- Owner
- Federal
- Corps of Engineers (Civil)
About this bridge
Access Road over Spillway Channel is a steel stringer/multi-beam or girder carrying Access Road over Spillway Channel in Worcester County, Massachusetts. It was built in 1957, so it is 68 years old, older than the Massachusetts average of 63.8 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 75 vehicles a day, roughly 4% of them trucks, projected to reach 50 by 2042. The structure is 97 ft (29.5 m) long and 21 ft wide. If it were closed, the detour would be 5 mi (8 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Access Road over Spillway Channel built?
It was built in 1957, making it 68 years old in 2025.
What condition is Access Road over Spillway Channel in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2024.
How much traffic does Access Road over Spillway Channel carry?
About 75 vehicles per day (2024 count), of which roughly 4% are trucks.
How long is Access Road over Spillway Channel?
The structure is 97 ft (29.5 m) long with a longest span of 95 ft (28.9 m) and a deck 21 ft wide.
Who owns Access Road over Spillway Channel?
It is owned by the Corps of Engineers (Civil).